Tehran · 24 m deep · 5 basements · Concrete frame

Avest Mixed-Use Tower

Avest Mixed-Use Tower – top-down construction by Irantopdown

Scope of work

Phase 1: design and construction of the concrete structure using the top-down method. Phase 2: supervision of the shell and finishing works.

Project data

Location Saadat Abad, Tehran
Excavation depth 24 m
Structural system Concrete frame
Floors above ground 8
Basement levels 5
Gross floor area 8,000 m²
Construction period 15 months
Client Avest Group