Top-down construction for deep urban basements. We build the structure and the excavation support together, from street level down to the foundation.

The city grows upward. We build it downward.

Excavation beneath completed slabs using the top-down method
Slab first · dig beneath
Top-down construction in progress – Irantopdown project site
Precast columns
Top-down construction in progress – Irantopdown project site
−36 m max

35

Projects completed

11

Under construction

21,800 m

Precast columns produced

62,000+

Hours without an excavation incident

The method

The structure is the shoring.

The building’s own columns, slabs and walls hold back the soil. We install precast columns on deep piles, cast the ground-floor slab, then dig down level by level beneath it. No separate excavation stage, no temporary support.

Falamak Residential Building – top-down construction by Irantopdown

01

Maximum excavation safety

The permanent structure braces the excavation at every stage, instead of temporary nailing, anchors or trusses.

02

Up and down at once

Once the ground-floor slab is cast, the floors above go up while the basements go down.

03

10–30% lower support cost

For 3–4 basements, about 10% below nailing or anchors and 30% below steel trusses. The deeper you go, the bigger the saving.

04

No neighbour consent

All work stays inside the site boundary. Nothing is anchored under adjacent plots.

Selected work

31 projects below the street.

Zafaraniyeh Residential Building – top-down construction by Irantopdown

Zafaraniyeh Residential Building

Tehran · 15 m deep · 3 basements · Steel frame
Atefi Office Building – top-down construction by Irantopdown

Atefi Office Building

Tehran · 15 m deep · 4 basements · Concrete frame
Bucharest Office Building – top-down construction by Irantopdown

Bucharest Office Building

Tehran · 15 m deep · 3 basements · Steel frame
Ghoddusi Office Building, Shiraz – top-down construction by Irantopdown

Ghoddusi Office Building, Shiraz

Shiraz · 15 m deep · 3 basements · Steel frame
Fars Judicial Experts Association Headquarters, Shiraz – top-down construction by Irantopdown

Fars Judicial Experts Association Headquarters, Shiraz

Shiraz · 14 m deep · 3 basements · Concrete frame
Berelian Niavaran Residential Tower – top-down construction by Irantopdown

Berelian Niavaran Residential Tower

Tehran · 30 m deep · 7 basements · Concrete frame
Darya Commercial & Office Complex – top-down construction by Irantopdown

Darya Commercial & Office Complex

Tehran · 23 m deep · 5 basements · Concrete frame
Rahmat Abad Commercial & Office Complex, Shiraz – top-down construction by Irantopdown

Rahmat Abad Commercial & Office Complex, Shiraz

Shiraz · 13 m deep · 3 basements · Concrete frame
Parastoo Commercial & Office Building (Jomhouri) – top-down construction by Irantopdown

Parastoo Commercial & Office Building (Jomhouri)

Tehran · 14 m deep · 3 basements · Concrete frame
Grand Ferdowsi Hotel – top-down construction by Irantopdown

Grand Ferdowsi Hotel

Tehran · 25 m deep · 5 basements · Concrete frame

Capabilities

One team, from soil model to finished frame.

We were the first in Iran to design and build top-down structures with precast concrete columns, so one team is responsible for the whole job.

Top-down construction in progress – Irantopdown project site

Design

Geotechnical & staged design

Every excavation stage modelled in 2D or 3D. Soil pressures and wall movements feed back into the structural model.

Vanak Commercial Tower – top-down construction by Irantopdown

Fabrication

Precast concrete columns

Cast under factory control at our own plant in Garmsar, then installed into drilled shafts and checked for plumb.

Top-down construction in progress – Irantopdown project site

Construction

Complete top-down structures

Concrete, steel and composite frames, plus waffle, Cobiax and U-Boot voided slabs.

Top-down construction in progress – Irantopdown project site

Supervision

Review & supervision

Independent design review and site supervision, plus assessment and retrofit of existing structures.

How we work

From first meeting to final slab.

01

Free consultation

We review your site, soil and the neighbouring buildings with you. The first session is free.

02

Geotechnical & staged design

We model each excavation stage and size the piles, columns and slabs for every step.

03

Precast columns

Columns are cast at our factory, then installed into drilled shafts and checked for plumb.

04

Top-down construction

Ground slab first. Then we dig and cast level by level while the floors above rise.

Top-down construction in progress – Irantopdown project site

62,000 hours without an excavation incident

Quality alongside safety is the first principle of our work.