Scope of work
Top-down design review, fabrication and installation of precast concrete columns, and construction of the concrete structure using the top-down method.
Project data
| Location | Shahrak-e Gharb, Tehran |
|---|---|
| Excavation depth | 12 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 3 |
| Gross floor area | 4,000 m² |
| Site area | 400 m² |
| Construction period | 15 months |
| Client | Eng. Hosseini |