Scope of work
Fabrication and installation of precast concrete columns, and supervision of structural construction using the top-down method.
Project data
| Location | Tehranpars, Tehran |
|---|---|
| Excavation depth | 17 m |
| Structural system | Concrete frame |
| Floors above ground | 7 |
| Basement levels | 4 |
| Gross floor area | 4,100 m² |
| Site area | 530 m² |
| Construction period | 12 months |
| Client | Eng. Karimi |
IRANTOPDOWN