Tehran · 17 m deep · 4 basements · Concrete frame

Golbarg Commercial & Office Building

Golbarg Commercial & Office Building – top-down construction by Irantopdown

Scope of work

Fabrication and installation of precast concrete columns, and supervision of structural construction using the top-down method.

Project data

Location Tehranpars, Tehran
Excavation depth 17 m
Structural system Concrete frame
Floors above ground 7
Basement levels 4
Gross floor area 4,100 m²
Site area 530 m²
Construction period 12 months
Client Eng. Karimi