Scope of work
Fabrication and installation of precast concrete columns, and construction of the concrete structure using the top-down method, in partnership with Fakhersazan Mandegar.
Project data
| Location | Chaharbandeh, Mehrshahr, Karaj |
|---|---|
| Excavation depth | 15 m |
| Structural system | Concrete frame |
| Floors above ground | 5 |
| Basement levels | 3 |
| Gross floor area | 7,500 m² |
| Site area | 1,300 m² |
| Construction period | 3 months |
| Client | Eng. Ansari |