Scope of work
Design and construction of the concrete structure using the top-down method.
Project data
| Location | Sattarkhan, Tehran |
|---|---|
| Excavation depth | 24 m |
| Structural system | Concrete frame |
| Floors above ground | 5 |
| Basement levels | 6 |
| Gross floor area | 4,000 m² |
| Site area | 500 m² |
| Construction period | 12 months |
| Client | Eng. Beglou |