Scope of work
Fabrication and installation of precast concrete columns to stabilize one side of the site using the top-down method, in partnership with Pibaan.
Project data
| Location | Qazvin Street, Tehran |
|---|---|
| Excavation depth | 22 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 5 |
| Site area | 3,000 m² |
| Construction period | 3 months |