Tehran · 10 m deep · 2 basements · Concrete frame

Mirza-ye Shirazi Commercial Building

Mirza-ye Shirazi Commercial Building – top-down construction by Irantopdown

Scope of work

Phase 1: structural design review, top-down geotechnical design, and fabrication and installation of precast concrete columns. Phase 2: construction of the concrete structure using the top-down method.

Project data

Location Mirza-ye Shirazi Street, Tehran
Excavation depth 10 m
Structural system Concrete frame
Floors above ground 6
Basement levels 2
Gross floor area 1,000 m²
Site area 200 m²
Construction period 7 months
Client Dr. Aeenfard

Similar site?

We design and build the whole job.

Geotechnical model, precast columns and the finished frame, from one team. Your first consultation is free.