Tehran · 10 m deep · 2 basements · Steel frame

Semangan Building

Semangan Building – top-down construction by Irantopdown

Scope of work

Phase 1: installation of precast concrete columns using the top-down method. Phase 2: supervision of excavation stabilization using the top-down method.

Project data

Location Narmak, Tehran
Excavation depth 10 m
Structural system Steel frame
Floors above ground 5
Basement levels 2
Gross floor area 1,400 m²
Site area 500 m²
Construction period 2 months
Client Eng. Ashtiani