Scope of work
Top-down geotechnical design, structural design, construction of the complete frame using the top-down method, and fabrication and installation of precast concrete columns.
Project data
| Location | Imam Khomeini Square, Tehran |
|---|---|
| Excavation depth | 25 m |
| Structural system | Concrete frame |
| Floors above ground | 8 |
| Basement levels | 5 |
| Gross floor area | 10,000 m² |
| Construction period | 14 months |
| Client | Eng. Shahram Pourazizi |