Scope of work
Top-down geotechnical design, structural design review, construction of the complete frame using the top-down method, and fabrication and installation of precast concrete columns.
Project data
| Location | Jomhouri Street, Tehran |
|---|---|
| Excavation depth | 14 m |
| Structural system | Concrete frame |
| Floors above ground | 5 |
| Basement levels | 3 |
| Gross floor area | 1,500 m² |
| Construction period | 9 months |
| Client | Eng. Banasaz |