Scope of work
Phase 1: top-down structural and geotechnical design, plus fabrication and installation of precast concrete columns. Phase 2: construction of the concrete structure using the top-down method.
Project data
| Location | Erfani Street, Niavaran, Tehran |
|---|---|
| Excavation depth | 30 m |
| Structural system | Concrete frame |
| Floors above ground | 13 |
| Basement levels | 7 |
| Gross floor area | 8,500 m² |
| Client | Dr. Dinpajouh |
IRANTOPDOWN