Scope of work
Design, fabrication and installation of precast concrete columns, plus full structural construction using the top-down method.
Project data
| Location | Ghasrodasht, Shiraz |
|---|---|
| Excavation depth | 14 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 3 |
| Gross floor area | 5,600 m² |
| Client | Fars Province Association of Judicial Experts |