Scope of work
Construction of the complete frame using the top-down method, geotechnical design, structural design review, and fabrication and installation of precast concrete columns.
Project data
| Location | First Square, Tehranpars, Tehran |
|---|---|
| Excavation depth | 23 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 4 |
| Gross floor area | 4,500 m² |
| Construction period | 12 months |
| Client | Eng. Sabzi |