Scope of work
Phase 1: installation of precast concrete columns using the top-down method. Phase 2: supervision of excavation stabilization using the top-down method.
Project data
| Location | Narmak, Tehran |
|---|---|
| Excavation depth | 10 m |
| Structural system | Steel frame |
| Floors above ground | 5 |
| Basement levels | 2 |
| Gross floor area | 1,400 m² |
| Site area | 500 m² |
| Construction period | 2 months |
| Client | Eng. Ashtiani |