Scope of work
Phase 1: structural design review, top-down geotechnical design, and fabrication and installation of precast concrete columns. Phase 2: construction of the concrete structure using the top-down method.
Project data
| Location | Mirza-ye Shirazi Street, Tehran |
|---|---|
| Excavation depth | 10 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 2 |
| Gross floor area | 1,000 m² |
| Site area | 200 m² |
| Construction period | 7 months |
| Client | Dr. Aeenfard |