Scope of work
Top-down design review, fabrication and installation of precast concrete columns, and construction of the concrete structure using the top-down method.
Project data
| Location | Niavaran, Tehran |
|---|---|
| Excavation depth | 17 m |
| Structural system | Concrete frame |
| Floors above ground | 6 |
| Basement levels | 4 |
| Gross floor area | 4,300 m² |
| Site area | 510 m² |
| Construction period | 15 months |
| Client | Eng. Taraghijah |